top of page
Captura de pantalla 2025-08-05 a la(s) 1.15.19 p.m._edited.jpg

Santa Clara Study Center

ONTIME-LOGO-02-01.png

Our mission

Achieve the perfect functioning, optimize and improve the use of the facilities of the Santa Clara Study and Research Center.

A complete piping, valve, and pump system was installed to ensure the proper operation of the pool. The setup included filtration systems, pressure control, and automated chlorination to maintain optimal water conditions.

20240202_084831.jpg

Solar
energy

A solar panel system was implemented to power the house, reducing energy consumption from the grid and improving the property's energy efficiency.

20240202_094308.jpg
20240202_091113.jpg
20240202_092713(0).jpg

Interconnected
Photovoltaic system

Contributing to the environment and betting on clean and sustainable energies, we installed

a total of

60 panels and 2 inverters

5kw power plants.

Captura de pantalla 2025-10-03 a la(s) 10.42.27 a.m..png

Project
overview

OnTime Services carried out the installation of key systems to enhance the comfort and energy efficiency of this residence. The project included the hydraulic infrastructure for the swimming pool, a solar panel system to power the house, and solutions for pool heating and cleaning.

We design and install residential and commercial hydraulic systems to guarantee the supply of water at “Hacienda los Picachos” property, governed by current regulations and carrying out the pertinent tests to guarantee the optimal functioning of the hydraulic installations, offering the supply of quality water to our clients.

20240202_092421(0)_edited.jpg
DSC05300.jpg

Did you like the project?

Contact us to quote yours.

DSC08281.jpg
bottom of page