Santa Clara Study Center

Our mission
Achieve the perfect functioning, optimize and improve the use of the facilities of the Santa Clara Study and Research Center.
A complete piping, valve, and pump system was installed to ensure the proper operation of the pool. The setup included filtration systems, pressure control, and automated chlorination to maintain optimal water conditions.


Solar
energy
A solar panel system was implemented to power the house, reducing energy consumption from the grid and improving the property's energy efficiency.



Interconnected
Photovoltaic system
Contributing to the environment and betting on clean and sustainable energies, we installed
a total of
60 panels and 2 inverters
5kw power plants.

%2010_42_27%E2%80%AFa_m_.png)
Project
overview
OnTime Services carried out the installation of key systems to enhance the comfort and energy efficiency of this residence. The project included the hydraulic infrastructure for the swimming pool, a solar panel system to power the house, and solutions for pool heating and cleaning.
We design and install residential and commercial hydraulic systems to guarantee the supply of water at “Hacienda los Picachos” property, governed by current regulations and carrying out the pertinent tests to guarantee the optimal functioning of the hydraulic installations, offering the supply of quality water to our clients.